More info on Nadav Simhoni

Published Jul 29, 20
2 min read

Table of Contents


Learn more on Nadav Simhoni

More info on Nadav SimhoniMore info on Nadav Simhoni

Mr Richard Diegong Dombo (left) and also Mr Nadav Simhoni (right) after the signing. With them is Mr Joe Ghartey Government of Ghana has authorized a US$ 560 million arrangement with Amandi Holdings Limited for the building of have authorized a $560 million arrangement for the construction of sections of the Western Railway Line.

The finalizing of the arrangement would be followed by Closet's approval for it to be required to Parliament. The jobs consist of the building and construction of areas of the Western Train Line, conventional gauge between Takoradi port and also Huni Valley, forming a total of 102kmIt will likewise consist of a single-track railway with stations along the tracks, a first workshop center at the place and a complement rolling stock.

Speaking at the signing ceremony, the Priest of Train Advancement, Mr Joe Ghartey, said the indicative range of jobs of the project includes the building, arrangement, testing and commissioning of other jobs; such as the construction of about eight kilometres of conventional gauge train tracks connecting the existing twin gauge tracks in Takoradi to the Takoradi Port for simple and efficient gain access to for cargo handling.

He said it would likewise consist of the construction of a by-pass area along the Kojokrom to Manso section of the Western Railway Line at Eshiem, to enhance the rate of the last framework and also meet the demand and also spec in the assessed 2020 Train Plan of attack."It likewise includes the construction of the Train Line from Manso to Huni Valley roughly 60km of solitary track lines, as well as on top of that the construction of eight standard stations along the existing line from Amantin to Huni Valley consisting of all building functions, terminal building, gain access to roads, CCTV and also access control, backup generator and water tanks."It will certainly also involve the building and construction of a workshop facility for basic gauge rolling supply consisting of the basic fit-out, basic tools and also vital machine," he specified.

Navigation

Home